From: route@monster.com
Sent: Thursday, April 07, 2016 11:49 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Juan A. Guerrero II 2506
Slice Right
Cr.
Email:
guerreroii@msn.com
Houston,
TX
77089
Phone: (713) 817-1024
SUMMARY OF
QUALIFICATIONS
Over
16 years of experience in the oil/gas pipeline industry. Experienced in
project/field controls, construction management, cost control and pipeline
mapping. Recent major projects worked: TransCanada Keystone XL and
Bison Pipeline Project, Escondido Water Supply, & Kinder Morgan Pipeline.
EDUCATION
· B.S. in Construction Management, University of
Houston, Central: 05/10 · B.B.A. in Finance, University of Houston,
Downtown: 12/03 · Project Management in Primavera
P6 Rel. 6.2 & 7 Certificate: 2010 · SPED PPD (Professional Piping
Designer) Level II Certificate, Houston Community College & SPED: 04/10 · Operator Qualification (OQ) in
Material Inspection, by Veriforce 08/10
WORK
HISTORY
Spectra
Energy
(contract employee)
09/13-Present Project Controls
Coordinator/Scheduler · Project: Sabal Trail Pipeline Project and AIM
Project · Coordinate “interviews” with all Project Team Leads
and PMs for project requirements. · Developed, maintained Air Permit schedule and
assisted with overall schedule alignment. · Assisted Project Team in identifying necessary
project changes. · Performed quality control on project control
deliverables for completeness and accuracy for major capital projects.
Coordinated development of Project Controls Monthly reports. Bechtel Corporation
09/11-09/13 Project Controls
(Project Scheduler) · Project: TransCanada Keystone XL - Gulf Cost
Project Pipeline Project (US $7Billion) · Maintained and analyzed contractor schedules for 8
Pump Stations along a 36” pipeline route. · Coordinate with the CM, site leads, procurement and
inspectors on a daily basis. · Assisted Cost Engineer with tracking units and
quantities; Assisted with updating and maintaining the QURR. Performed
routine assigned tasks related to preparation & application of schedule
updates. · Reported schedule deviations on assigned tasks.
Gathered information to support specific schedule studies, work force and
quantity data for updating and providing current actual information for
discipline or specialty progress and performance reports; traced
critical-path events & perform schedule analysis. Assisted in
identifying the scope associated with schedule activities. · Issued full & 4 “Week-look-ahead” schedule
analysis on a weekly basis. · Developed a Key Commodity tracking spreadsheet and
distributed to the team on a daily basis. · Performed site walk-downs and weekly status meetings
as directed. · Track BEA & Construction Readiness activities
for Keystone XL project which contained over 36 Pump Stations. Prepared
and presented schedule information at meetings, as directed. · Project: (EWS) Escondido Water Supply
Project(US $3.4Billion) : · Created a full EPCM resource loaded schedule in a
timely manner; assisted in planning, which contained (2) 42” Pipelines
(177km), 5 Pump Stations and a 2 Cell Reservoir for a South American
project. · Performed interactive scheduling sessions with the
entire EPCM team. URS
04/11-09/11 Engineering
Technician, Scheduler & Design · Develop several schedule for various pipeline feed
projects; Create feed schedules & sketches. S&B
Infrastructure
09/10-04/11 Engineering
Technician, Project Scheduler · Created a fully resource loaded EPCM Schedule;
Monitor & update schedule tasks, issued schedules weekly along with other
reports; Performed quantity take-offs as well. UniversalPegasus
04/10-09/10 Engineering
Technician, Cost Control · Project: TransCanada Bison Pipeline Project(US
$300Million) · Mobilized to construction field office to perform
project/cost controls duties: primarily performed cost control, project
tracking and reporting on a 300 mile 30” Pipeline project. · Assisted Project Controls lead & Contract
Administrator with developing cost control procedures; Evaluation &
interpretation of logging daily reports onto database. · Generated daily & monthly cost reports in
tabular and graphical formats for project in Excel, and other tools.
Dealt with 50 project inspectors overall; Time & Material tracking using
Excel. · Assist Project Planner in entering the cost estimate
in the project plans in Primavera or other Project Management tools, as
required. · Tracked all 300 miles of pipe from Freight Trains,
to pipe yards, and to right-of-way. · Performed cost data processing and analysis in order
to provide Management with project status, forecasts and definition of
alternatives; also assisted with Change Orders. AMEC Paragon
05/06-01/10 Project Field
Controls / Sr. Pipeline Design Mapper Project
Field Controls Position
· Stationed at construction site from start to
finish. Within time & budget tracked cost & construction
progress of a 10” pipeline replacement project. Reported to Owner, PM
& PE daily. · Assembled and compiled estimate data and prepared
designated portions of budgets, as directed. · Attended weekly meetings to present construction
status and daily burn rate of project; coordinated with subcontractors &
vendors to obtain needed information on a daily basis; Performed Time &
Material tracking on a daily basis. Sr. Pipeline
Mapper (duties) · Created alignment sheets,
permits, & HDD have; Coordinated plats; Met all deliverable within time. El Paso Energy
01/06-5/06
Sr. Pipeline Lead
Mapper · Generated alignment sheets via Blue-sky to meet
filing deadlines (91 miles, 36” Pipeline) · Dealt with RPLS & field engineers on a daily
basis; Plotted deeds & processed survey data. Universal Ensco Inc.
04/05-12/05 Sr. Pipeline Mapper · Stationed in ROW field-office to create property
plats; Proficient with ROW procedures. City of Houston –
Public Works & Engineering, Traffic &
Transportation
01/05-04/05 Project Technician
II · Performed CAD activities associated with Traffic
Signal Permit Plans & Highway Design Plans. Universal Ensco Inc.
07/04-12/04 Project Controls
Tech. (Temp Seasonal) · Assisted project controls team with planning;
assisted with system conversion onto (JD Edwards). Universal Ensco
Inc.
02/97-11/02 Sr. Pipeline Mapper · Created pipeline construction drawings &
alignment sheets based on engineer & survey notes. · Prepared and modified platform layouts, revised
& pick-up redlines for several off-shore projects.
SKILLS
· Primavera P6 R8.2, Microsoft Project 2010; Trained
in TILOS 7.1; Milestones Prof. 2010 · Construction Management: Estimating, Quantity
Take-Offs, Material Tracking, Change Management, Subcontractor Supervision,
Field Experience. · AutoCAD 2010 Civil 3D, BlueSky, PowerPoint, Word,
Excel & Access REFERENCES
Available upon request Résumé:
Juan A. Guerrero II |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Intermediate |
|
|
|